Ontario fast-tracks Red Lake Transmission project
Ontario has designated the Red Lake Transmission Line a priority infrastructure project and selected Hydro One to develop and construct the new link.The move fast-tracks regulatory approvals through a ministerial directive to the Ontario Energy Board. The project comprises a 162km double-circuit...