Trianel plans 1.8GWh battery in Waltrop
Trianel is planning a battery storage facility in Waltrop, North Rhine-Westphalia with a first phase designed for a 900MW capacity and 1.8GWh of storage.The project will be built on a plot of unused land originally intended as a construction site for the neighbouring Trianel coal-fired power plant...